Product Roadmap — OneOpen Workboard
Living engineering index for Workboard capability phases (Software + Service + Enterprise). Spaces and other suite surfaces belong to Loom, not only to Workboard.
Baseline: Phase 1 Kanban coherence is complete. See Product Gap Analysis — OneOpen Workboard.
Phase |
Name |
Status |
|---|---|---|
1 |
Kanban coherence |
Done |
2 |
Ranked backlog + hierarchy |
Done |
3 |
Scrum sprints |
Done |
4 |
Configurable workflows + board mapping + WIP |
Done |
5 |
Field catalog (labels, components, custom fields) |
Done |
6 |
Issue navigator + OQL + saved filters |
Done |
7 |
Agile reports |
Done |
8 |
Automation + webhooks + notifications |
Done |
9 |
Roadmaps, epics, cross-team plans |
Done |
10 |
Releases, versions, time tracking |
Done |
11 |
Dashboards + templates + forms |
Done |
12 |
Service Management essentials |
Done |
13 |
Spaces hooks (docs links; full Spaces is a Loom product) |
Partial |
14 |
Permissions, SSO, compliance |
Done |
15 |
Integrations, PWA, apps platform |
Done |
Delivery waves
Wave A (2–4): Real Scrum/Kanban tool — shipped
Wave B (5–8): Fields, query, reports, automation, notify — shipped
Wave C (9–13): Portfolio, releases, time, service desk, wiki, dashboards — shipped
Wave D (14–15): Enterprise identity, Git/CI, PWA, plugins — shipped (stubs where noted)
Key code anchors
Area |
Backend |
Frontend |
|---|---|---|
Rank / backlog |
|
|
Sprints |
|
|
Board settings |
|
|
Fields |
|
Project Fields tab |
OQL / navigator |
|
|
Reports |
|
|
Automation / notify |
|
Topbar inbox |
Roadmap / plans |
|
|
Versions / time |
|
|
Dashboards |
|
|
Service desk |
|
|
Spaces |
|
|
Enterprise |
|
Workspace Administration |
Integrations / PWA |
|
Integrations tab, |
Migration
cd backend
alembic upgrade head # includes 202608090002_parity_phases
Non-goals (still)
Full Marketplace economics
Exhaustive query language coverage beyond the OQL subset
Multi-region data residency productization
Production-grade SAML assertion crypto (OIDC config + validate stub; SAML ACS/metadata present)